EcoSteel

EcoSteel

by GOAT AI

EU CBAM definitive period · Jan 2026ISO 14404India CCTSResponsibleSteel

EcoSteel by GOAT AI

Stop paying for default values. Submit actual data.

At India's default values, EU buyers of Indian hot-rolled coil face a CBAM charge of about €278 per tonne of steel, on top of the steel price (Q3 2026 certificate price). EcoSteel calculates your actual embedded emissions, heat by heat, from data your plant already records — and prepares the evidence your accredited verifier needs.

CBAM certificate: €82.32/tCO₂e (Q3 2026, published 5 Oct 2026) · Default mark-up +10% in 2026 · First annual declaration: 30 Sep 2027
EU CBAM Certificate
€82.32

per tCO₂e · Q3 2026 · published 5 Oct 2026

CBAM charge at default values (4.708 tCO₂e/t incl. mark-up)€277.60/t
CBAM charge with actual data, example (2.1 tCO₂/t)€62.86/t
Saving per tonne exported€214.75/t

CBAM charge per tonne of steel, paid by the EU importer on top of the steel price · Net of free allocation · Mark-up 2026 +10% · 2027 +20% · 2028 +30% · Reg. (EU) 2025/2621, 2026/1740, 2025/2620

Carbon footprint by process step (tCO₂e/t) · illustrative

Iron Ore
0.1
→
BF
1.4
→
BOF
0.55
→
LF
0.08
→
Slab
0.05
→
HRC
0.03
EU CBAM — definitive period from 1 Jan 2026

Certificate price: €82.32/tCO₂e (Q3 2026, published 5 Oct 2026)

India HRC default 4.28 tCO₂e/t (4.708 with 2026 mark-up), net of free allocation → CBAM charge €278/t of steel vs €63/t with actual data at 2.1 tCO₂/t. The EU importer pays; the cost lands on your price.

Mark-up +10% in 2026 · +20% in 2027 · +30% from 2028 · From 1 Jan 2027: weekly certificate price, and importers hold certificates for 50% of emissions each quarter · Extension to downstream products proposed

India CCTS

Installation-level emission intensity targets

India's Carbon Credit Trading Scheme sets emission intensity targets for energy-intensive sectors. Same heat-level data serves CBAM and CCTS reporting.

CCTS carbon prices are not yet deducted in the CBAM figures on this page

Platform

Core Capabilities

One platform covering both CBAM and India CCTS reporting from the same plant data.

Tap-to-tap carbon calculation synced with your BOF/EAF heat schedule — methodology aligned with ISO 14404

CBAM + CCTS

Draft CBAM XML export modelled on the EU QReport structure, auto-named by heat-ID and declarant period

CBAM

Default vs actual cost dashboard — see the €/t difference on every EU shipment

CBAM

India CCTS emission intensity tracking against your installation target

CCTS

Green-steel premium tracker by coil, customer segment and ResponsibleSteel readiness

Green Steel

MRV baseline report for CCUS and other funding applications

CCUS

Value

One data set. Three uses.

The emissions data that lowers your buyers' CBAM cost also serves India CCTS reporting and the baseline for CCUS and other funding applications.

€215/t
CBAM saving
Per tonne exported to the EU — actual 2.1 tCO₂/t vs India HRC default, net of free allocation (Q3 2026 price). Use the calculator for your own figure.
CCTS
India CCTS reporting
Same heat-level data, measured against your installation's emission intensity target.
Baseline
Funding applications
A documented MRV baseline for CCUS and decarbonisation funding applications.

Method

Physics-grounded, not black-box.

EcoSteel builds carbon and energy balances for each heat from data your plant already records. Every figure is traceable to its inputs and carries a stated uncertainty, so your verifier can follow the calculation end to end.

Methodology aligned with

GHG ProtocolISO 14404EU CBAMIndia CCTSSASB SteelResponsibleSteel

CBAM Default vs Actual — See Your Real Exposure

India HRC default 4.28 tCO₂e/t (4.708 with 2026 mark-up) · free allocation 0.975 × 1.37 on defaults / 0.975 × 1.371 on actual data (BF-BOF, assumed precursor mix) · certificate €82.32/tCO₂e (Q3 2026, published 5 Oct 2026)

CBAM charge per tonne of steel exported to the EU: paid by the EU importer on top of the steel price, and usually passed back to the mill.

CBAM charge at default values

€138.8M

€278 per tonne of steel · 3.372 certificates/t

CBAM charge with your actual data

€31.4M

€63 per tonne of steel · 0.764 certificates/t

Annual saving

€107.4M

€215/t by submitting actual data

Green-steel premium potential

Reduce intensity below 1.8 tCO₂/t

Illustrative: assumes $100/t below 1.8 tCO₂/t

This uses an intensity you typed. Send us 10 real heats and we calculate yours.

Email these results

Cost = (embedded emissions − free allocation) × quarterly certificate price. Default path: India default 4.28 tCO₂e/t with the 2026 mark-up, and free allocation 0.975 × 1.37 (the BF-BOF Column B benchmark assigned to India). Actual path: free allocation built from Column A process benchmarks and an assumed precursor mix for your route (BF-BOF: 1.03 t slab/t HRC, 0.90 t hot metal/t slab, 1.55 t sinter+pellets/t hot metal; DRI-EAF: 0.85 t DRI/t slab, 1.45 t pellets/t DRI; scrap-EAF: no CBAM precursors). Your verified mass balance decides. Defaults per Implementing Regulations (EU) 2025/2621 and 2026/1740; benchmarks per (EU) 2025/2620. Indicative only; your verifier and EU importer determine the final figure.

Plant Intelligence Dashboard — Demo

Heat and mass balances built from the data a plant already records, with every figure traceable to its inputs.

Demonstration with synthetic data. This shows how EcoSteel presents plant-level results. No customer data is displayed.

Demo Plant — Complete Plant Operations

Synthetic data, refreshed in the browser to show how monitoring looks

demo
4,250
Tonnes Steel Today
2,850
MWh Energy
12,400
m³ Water
185
Tonnes Waste
82.4%
Plant Efficiency

BLAST FURNACE

2 units • 2 operational

Blast Furnace C
Capacity
92.3%
Efficiency
78.5%
Quality
94.2
Blast Furnace D
1 alerts
Capacity
88.7%
Efficiency
76.1%
Quality
91.8

STEEL MAKING

2 units • 1 operational

BOF Steel Plant 1
Capacity
94.1%
Efficiency
82.3%
Quality
96.5
BOF Steel Plant 2
3 alerts
Capacity
0.0%
Efficiency
0.0%
Quality
0.0

CONTINUOUS CASTING

2 units • 2 operational

Continuous Casting 1
Capacity
96.8%
Efficiency
89.2%
Quality
98.1
Continuous Casting 2
Capacity
89.4%
Efficiency
87.6%
Quality
97.3

COKE PLANT

2 units • 2 operational

Coke Battery A
2 alerts
Capacity
91.2%
Efficiency
74.8%
Quality
92.4
Coke Battery B
1 alerts
Capacity
87.9%
Efficiency
72.1%
Quality
90.8

SINTER PLANT

1 unit • 1 operational

Sinter Plant 1
Capacity
93.6%
Efficiency
81.4%
Quality
95.2

POWER PLANT

2 units • 2 operational

Power Plant 1
1 alerts
Capacity
88.3%
Efficiency
42.6%
Quality
89.4
Power Plant 2
Capacity
76.2%
Efficiency
41.8%
Quality
87.6

OXYGEN PLANT

1 unit • 1 operational

Air Separation Unit 1
Capacity
97.4%
Efficiency
85.7%
Quality
99.2

Blast Furnace C - 24-Hour Trends

Production, emissions, efficiency, and energy consumption

00:0004:0008:0012:0016:0020:00
Production Rate
Emissions Intensity
Energy Efficiency
Energy Consumption

Current Performance

Production Rate185 t/h
Daily Target180 t/h
Quality Index94.2
Energy Efficiency78.5%

Emissions Profile

CO₂ Intensity
1.42t/t steel
NOₓ
139mg/Nm³
SO₂
112mg/Nm³
Particulates
45mg/Nm³

Standards

Methodology aligned with

EU CBAM
India CCTS
ISO 14404
GHG Protocol
SASB Steel Standard
ResponsibleSteel

Physics-grounded, not black-box: carbon and energy balances for each heat, each carrying a stated uncertainty, so your verifier can follow the calculation end to end.

Operations

Steel Operations Dashboard — Demo

Demonstration with synthetic data. This shows how EcoSteel presents plant-level results. No customer data is displayed.
Demonstration with synthetic data. This shows how EcoSteel presents plant-level results. No customer data is displayed.

CO₂ Intensity

2.1 tCO₂/t

Energy Burn

$355,000

Safety Risk

LTI 2 | HIPO 12

Value Today

$11,671

Stack Emissions (recent)

NOx SOx PM
Loading demo charts…
mg/Nm³ (relative scale per series)

Avg NOx

120 mg/Nm³

Avg SOx

80 mg/Nm³

Avg Particulates

15 mg/Nm³

Energy Intensity

520 kWh/t

WHR potential: 65%

GHG Intensity

2.1 tCO₂/t

Total: 850,000 tCO₂e

Safety (QTD)

LTI 2 | FAI 8 | Near Miss 145

OHI: 0.8

Opportunity Radar · illustrative

Synthetic values, not an assessment

Waste Heat Recovery

Energy

$2,400,000

Illustrative confidence: 85%Illustrative payback: 14 mo

Coke Plant Upgrade

Carbon

$890,000

Illustrative confidence: 78%Illustrative payback: 18 mo

Slag Utilization Boost

Circularity

$650,000

Illustrative confidence: 72%Illustrative payback: 10 mo

SafeOps Program

Safety

$320,000

Illustrative confidence: 70%Illustrative payback: 8 mo

Standards

Methodology aligned with

GHG Protocol

Methodology aligned

ISO 14404

Methodology aligned

EU CBAM

Methodology aligned

India CCTS

Methodology aligned

SASB Steel

Methodology aligned

ResponsibleSteel

Methodology aligned

Value Waterfall · illustrative

Synthetic values, not an estimate for any plant

Baseline$0Energy$2,400,000Credits$890,000Circularity$650,000Safety$320,000Total$4,260,000

Includes energy efficiency, carbon credits, waste circularity, and safety/downtime avoidance.

Business Impact — Value Creation Potential

Illustrative · synthetic data

Energy Efficiency

$2,400,000

Carbon Credits

$890,000

Waste Circularity

$650,000

Safety & Downtime

$320,000

Derived from simulated intensity, CO₂ totals, waste utilization, and incident archetypes.

Total: $4,260,000

EU CBAM XML Generator

Generate your CBAM declaration XML

Draft XML modelled on the EU QReport structure. Not yet validated against the schema the CBAM Registry accepts for definitive-period declarations — check before upload.

1
2
3

Reporting Period

Year
Quarter

EU Authorised Declarant

The EORI-registered EU importer who submits the CBAM declaration to the EU registry.

EORI Number (e.g. DE123456789012345)
Company Name
Role
City
Postcode
Street

Signatory

Full Name
Position / Title
Place of Signing

Additional Remarks (optional)

Verifier Handoff Package

Build your verification package

Prepares the evidence an accredited verifier reviews before issuing a CBAM verification statement: a calculation report, an ISO 14404-aligned worksheet, and a draft CBAM XML. EcoSteel calculates; only an accredited verifier verifies.

1
2
3
4
1

Reporting Period

2

Installation

Auto-set from route

3

Operator Contact

4

Target Verifier

Expert CBAM Agent

Ask the CBAM expert

Grounded in EU Regulations 2023/956 & 2023/1773, the 2026 definitive regime, Implementing Regulation (EU) 2025/2621, ISO 14404:2024 (Parts 1–3) and India CCTS. Answers methodology questions, reviews calculations, and provides CN code guidance.

AI

CBAM Expert

ISO 14404:2024 · EU Reg 2023/956 · India CCTS

Ask anything about CBAM for steel

Methodology, CN codes, calculation edge cases, India CCTS crosswalk, portal registration — pick a question below or type your own.

Powered by Claude · Grounded in EU Reg 2023/956, Impl. Reg. 2025/2621, ISO 14404:2024, India CCTS · Indicative only — your accredited verifier and EU importer determine the final figure

Get started

First annual declaration: 30 Sep 2027.
Don't pay for default values.

Send us the data for 10 heats of one EU-bound product. Within 72 hours of receiving it, we return a preliminary CBAM exposure estimate against the EU default, with a worksheet listing every input and assumption — free.

See what we need first. Data templates by route: BF-BOF → caster → mill · DRI → EAF/IF → caster → mill · Scrap → EAF/IF → caster → mill · Re-roller (bought slabs/billets)

Calculated, not verified — only an accredited verifier verifies